+/- 40 or, This Winter's Upgrades
Reply #27 –
Tee minus 2wks until my next event! Better get my To Do list up here.
First though, so pretty with new headlights...I thought I did a decent job polishing out the old ones, pshaw! these things are gorgeous.
IC and plumbing is re-installed, re-ran one of my crank case vent lines to make it look better, tied up my wiring bundles both in the bay and under the car.
Wheels, yeah about that. I have received a complete refund on the incorrect parts, but the proper pieces are a lil over a month out. I am meeting up with a guy tomorrow and trading a set of tri-bars for a pair of FR500's. The FR500's are 9" wide and will be my planB to get the 275's under the rear of the car until my new wheel parts arrive.
Other things that need done in the next two weeks:- Finish inner tie rod install
- Have 275's mounted on FR500's
- Install new ign switch and pigtail
- Reinstall center console, and passenger front seat
- Get car aligned
After the car is back on the road, I will build and install the jumper harness for the MAF sensor and aquire the silicone and hard pipe parts I need to eliminate the VAM.
Then a tune! :burnout: