Skip to main content
Topic: whats wrong with this picture (Read 886 times) previous topic - next topic

whats wrong with this picture

my scope is to get all misc ckts over to panel C like I have shown making it a generator house panel.
this makes panel A & B empty
now we source 15) 4kw rectifiers from Panel A , and 15) 4kw rectifiers from panel B dedicated to the 2500A dc plant.

Of course that will never work,, as you can see.

btw, customer supplied us with the scope,,
my options are in the green boxes and I dropped in stop signs where needed.